USCG: CG-CVC Policy Letter 17-02 (Change 2) Use of Existing Safety Management Systems to Obtain an Initial Certificate of Inspection Under 46 CFR Subchapter M

09/18/2018

The USCG published Change 2 to CG-CVC Policy Letter 17-02 (CH 2) Use of Existing Safety Management Systems to Obtain an Initial Certificate of Inspection Under 46 CFR Subchapter M.

Click here to download CG-CVC Policy Letter 17-02 (Change 2)

Leave a Reply

You must be logged in to post a comment.